Charging electric trucks on a grid connection that is too small

Sound familiar?

The vehicles are here. The grid connection is not.

An e-truck, electric buses, a fleet of vans or electric equipment: more and more businesses want to charge, but their grid connection is too small. Grid reinforcement often takes years. A battery recharges steadily through your existing connection and delivers the power the moment a vehicle is at the charger. That lets you fast charge without waiting for the grid.

How it works

The battery absorbs the peak. Not your grid connection.

A fast charger briefly demands a lot of power. Your grid connection often cannot deliver that. So the battery recharges continuously at low power through your existing connection. When a vehicle is at the charger, the battery supplies most of the power.

Control is automatic and you monitor everything remotely. Get a heavier connection later after all? The battery stays useful for shaving peaks. And you can take mobile systems and containers to your next location.

FutureNed fast charger with battery in use

Our solutions

Which solution suits you?

If you charge at one fixed location, a fast charger with a built-in battery is often the simplest option. If you want flexibility or change locations, choose a mobile battery or a complete container. Below you can see which products are used most often in transport and logistics.

Products for transport and logistics

PowerBank EV193

PowerBank EV193

193 kWh · up to 204 kW charging

Fast charger with battery. Works on a connection of just 10 to 40 kW.

PowerBank BCE1000M

PowerBank BCE1000M

1,000 kWh · 360 kW DC charging

A charging hub in a container, plus up to 500 kW of power for your site.

PowerBank BC400250

PowerBank BC400250

400 kWh · 250 kW

Mobile battery with Powerlock connection, for heavy equipment at changing locations.

Our approach

From question to working charging point.

1. You tell us which vehicles you want to charge, how often, and how large your grid connection is.

2. We calculate which combination of battery and charger fits your situation.

3. Your installer or one of our dealers places and connects the system. Many systems are in stock in Mijnsheerenland.

Frequently asked questions

Do I need a large-consumer connection to fast charge?

Not necessarily. The EV193 works on a three-phase connection of 16 to 63 A (10 to 40 kW) and still charges at up to 204 kW. The built-in battery supplies the extra power.

Can I also charge trucks and buses?

Yes. The EV193 charges at up to 204 kW. For higher power, the BCE1000M delivers 360 kW DC from a 1,000 kWh battery.

What if my fleet grows?

The mobile PowerBanks can be linked together for extra power and capacity. That way storage grows with the number of vehicles.

Are there subsidies for charging infrastructure with a battery?

For charging infrastructure on your own premises there are schemes such as SPRILA. Which scheme applies to you depends on your situation. Get in touch and we will work it out together.

Contact form

Request advice or a quote

Tell us briefly what you are looking for, or which customer you are asking for. We will get back to you as soon as possible.

Prefer direct contact? Call +31 (0)186 203 060 or email info@futurened.com

Thank you for your message. We will get back to you as soon as possible.
Something went wrong while sending. Please try again or email info@futurened.com.